John Lewis, Nottingham - Service Building

Client: John Lewis Partnership
Sector: Distribution Centres

Major refurbishment with new high bay extension and loading bays.
 
Continued growth of John Lewis selling space created a need for additional or combined distribution depots to service the extended requirements.
 
John Lewis' existing distribution depot in Nottingham (Arnold) was identified as a key facility to provide services to existing and future branches in the surrounding area. The key element of the works was to create additional space within a space by redesigning the mezzanine layout and upgrading / altering the existing mechanical and electrical systems.
 
Lateral Technologies & Solutions Ltd's design included modifications to existing heating, ventilation, air conditioning and domestic hot water systems, main electrical distribution, fire alarms, lighting and sprinkler systems.

Interested?

Contact Derek Wheelan direct, call us on 01698 464470, or fill in the form below.

Commissioning Management
projects

Energy Management
projects

Low Carbon MEP Design
projects

CIBSE BRE CIBSE Low Carbon Energy Assessors CIBSE Low Carbon Consultants Scotland CIBSE Low Carbon Consultants CHAS Construction Line Altius Altius